News

How to improve your multi-site equipment tracking

Ask where a particular chain block is and you’ll usually get an answer. Ask whether that answer is right, and how they know, and it gets harder.

With one yard, you can walk around and look. Spread the same equipment across several depots, a couple of warehouses and a string of customer sites, and the answer often lives in a spreadsheet someone updated last month. Or in a per-site log only the depot manager understands. Or in someone’s head.

Multi-site equipment tracking means keeping one up-to-date record of every asset across all your locations: where each item is, whether it’s compliant, and when it’s next due for inspection. Without it, the records and what’s on the ground drift apart. That’s where equipment goes missing, sits idle in the wrong place, or quietly runs past its inspection date.

 

Why spreadsheets fall behind once equipment moves between sites

For equipment owners, the trouble is movement. A sling set goes from the amin depot to site in March, on to a second site in May, then returned to a different depot. Each move is a chance for the record to slip, and per-site logs mean nobody has the full picture without pulling them together by hand.

For inspection companies, it’s volume and distance. You’re holding records for equipment you don’t own, across dozens or hundreds of client sites, and relying on clients to tell you what’s moved, been scrapped or been bought since your last visit. Often you find out when the engineer arrives.

The cost shows up in small ways first. Hiring in kit you already own because nobody can confirm where yours is. A job held up while someone hunts for a certificate. An item marked “not presented” at inspection because it’s been sitting at a customer site since spring.

 

What should multi-site equipment tracking show you?

In practice, multi-site equipment tracking comes down to three things for each asset: the location it’s assigned to, it’s current compliance status and its next inspection date, held in one register that covers every site.

Most inspection tools already handle the history. Scan an item and you can see when it was last inspected, who did it and what they found. That’s the record an auditor will ask for.

 

How multi-site equipment tracking works in CheckedOK

CheckedOK asset register with search filters open for inspection dates, company and location, beside a list of assets and their next inspection dates
Filter the asset register by company, location or sub-location

CheckedOK, CoreRFID’s inspection and compliance management software, keeps every asset in a single register, with locations set uup to match how the business runs. Equipment owners tend to mirror their depots and the warehouses inside them. Inspection companies usually set up each client and their sites, so engineers know what’s expected at a location before they arrive.

When an item moves from Warehouse A to Warehouse B, it moves in the system too. The register can be filtered by company, location, category, status, inspection interval, engineer, serial number and more so “everything at the north depot that’s non-compliant” is a quick filter.

Each asset carries a compliant or non-compliant status. CheckedOK already manages over 7 million assets across more than 577,000 sites, for 288,000+ companies.

When someone scans an item, they go straight to its record: last inspection, current status, next due date and any attached documents. Whoever checks it, at whichever site, sees the same up-to-date information.

Items can be identified with RFID tags, NFC or QR codes. Our explainer on Digital Product Passports covers the tagging side in more detail.

 

Giving clients visibility of their own equipment

Clients can have their own portal logins to see the equipment at their sits and its inspection status. What they can see and do is set by the permissions you give their user type.

For inspection companies, that cuts the steady flow of certificate requests into the office. For equipment owners with kit on long term hire, it gives the customer the same view you have. There’s no charge for customer portal users, which adds up quickly when you have hundreds of client logins.

 

Equipment expiry tracking across every site

CheckedOK dashboard showing totals for passed, failed, repaired, not presented and due items above the asset list
Items not presented and due by a set date, across every location

Equipment expiry tracking means seeing, across every location, which items are approaching their next inspection or certification date. Single items aren’t usually the issue, clusters are. 40 slings across four depots falling due in the same fortnight, or a client’s hoist that moved sites after its last examination and dropped off the schedule.

In CheckedOK, every asset’s next inspection date sits on its record, and the dashboard shows how many items fall due by a set date across all locations. Automated due date reminders go out ahead of time. Equipment owners use that window to get items back from site; inspection companies use it to plan visits and give clients notice.

Manufacturer certificates and other third-party documents can be attached to an asset as PDFs, so they’re on hand whenever the tag is scanned.

 

Why missing equipment and overdue inspections tend to be the same items

Equipment that’s hard to find is the equipment most likely to miss its inspection. If it isn’t there when the engineer arrives, it’s marked as not presented, and someone now has a location problem and a compliance problem at once.

Filtering inspections due by location or sub-location turns that into a list per site, weeks ahead. Teams can then audit their assets to ensure everything is logged and in the right location ahead of the inspection, making the inspecting engineers’ on-site time more efficient and protecting your equipment’s compliance status.

 

How CheckedOk customers improved equipment visibility

Rainbird Crane Services works across multiple sites in the South East, on projects including 8 Bishopsgate and CITI Tower. Before CheckedOK, equipment was tracked in Excel, with records split across spreadsheets, email attachments and paper.

Managing Director, Jonathan Rainbird, put it plainly:

“Traceability was also a challenge, and it was difficult to know exactly where each item was at any given moment.”

Since the move to CheckedOK:

“It’s easier now to know where each item is, and that’s made our day-to-day operations much smoother.”

Read the full Rainbird Case Study

 

How to improve your multi-site equipment tracking: where to start

Galvanised bow shackle with an RFID tag secured by a cable tie, held in an engineer's hand
The right tag fitting depends on the kit

The CheckedOK customers who get the most out of multi-site equipment tracking early tend to make the same few decisions first.

They settle what a location means before anything else: a depot, a warehouse, a client, a client’s site, or a mix. Getting that right up front saves restructuring the register later.

They bring existing data across in one go, using our CSV template – for either their own spreadsheets or exports from other systems – so it maps into the right fields without re-keying.

CheckedOK mobile app equipment details screen with NFC and QR scan buttons and a not presented option
Engineers can assign a tag to an item on site using NFC

Their Customer Success Manager helps get the structure of that upload right first time.

They also tag items and add them to the system at the same time, ideally from day one, so every record is linked to its physical asset from the start. Different fittings suit different kit, so few use the same RFID tag on everything.

Across multiple clients, engineers can assign a tag to an item at any point using the NFC reader on their phone or tablet.

 

If your records are under pressure from the audit side as well, our piece on HSE inspection records compliance is worth a read next. Same register, different question.

If you’d like to see CheckedOK working, try the software or watch the walkthrough. When you’re ready to talk, bring your current spreadsheet along and we’ll show you how it would look as a single register.