Try a LOLER inspection, right now

Equipment Details
Description
Serial #
SWL
Manufacturer
Category
Sub Location
Step 1 of 3
Purpose of Examination
Is this the first examination after installation or assembly at a new site or location?
Step 2 of 3
Identification of any parts found to have a defect which is or could become a danger to persons:
Particulars of any repair, renewal or alteration required:
Is the above a defect of immediate danger to persons?
Could this become a danger to persons?
Step 3 of 3
Identification of any parts not accessible for examination:
None
Particulars of any test carried out:
N/A
Observations made during this examination:
📷 Camera
🖼 Gallery
NOT SAFE FOR USE
SAFE FOR USE
Sign to Complete

Type your name to sign this report as the appointed examiner.

Get your report

Enter your details and we'll show you a preview of the report, filled in with today's demo data.

Company name
Work email
Please fill in both fields with a valid email.
✅

Preview your report

Your engineers will use the same workflow onsite. You set the questions in the office, they run through the checklist, log any defects and sign off each report from their handheld device. Here's a preview of the report, completed with today's demo data.

CoreRFID LEEA Associate Member

LOLER REPORT OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT

This report complies with the requirements of Schedule 1 of the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)

Date of Thorough Examination:
Your Reference:
 
Report #:
Colour Code:
Brown
Job No:
DEMO
Name and Address of employer for whom the thorough examination was made:
Address of premises at which the examination was made:
Demo Site
Description and identification of the equipment:

Description: Shackle
Serial number: DEMO-SH01
Asset number: N/A
Manufacturer: Lifting Manufacturing Inc
Supplied new: No
Safe Working Load(s):
50T
Date of manufacture if known:
 
Date of last thorough examination:
 
YesNo
Is this the first examination after installation or assembly at a new site or location?✓
If the answer to the above question is YES has the equipment been installed correctly?  
YesNo
Within an interval of 6 months?
Within an interval of 12 months?
In accordance with an examination scheme?✓
After the occurence of exceptional circumstances?✓
Other✓
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect (If none state NONE):
Is the above a defect which is of immediate danger to persons?YesNo
Is the above a defect which is not yet but could become a danger to persons (if YES state the date by when):
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
Identification of any parts not accessible for examination:
None
Particulars of any tests carried out as part of the examination (If none state NONE):
N/A
Observations made during this examination:
IS THIS EQUIPMENT SAFE TO OPERATE?YesNo
Name / Signature of person making and authenticating this report with qualification:

Company Appointed Examiner
Latest date by which next thorough examination must be carried out:

This is a demonstration report generated for evaluation purposes only.

get hands on with checkedok

This demo walks you through one example LOLER checklist, so you can try the workflow in a minute or less. No sign-up needed until the end.

Pick an asset, work through the checklist, log a defect and sign off, the same way one of your engineers would on a phone or tablet.

This is one example configuration.

In the live platform, none of it is fixed. Your admin team writes every question, chooses whether each answer is a dropdown, multiple choice or free text field, and builds templates for PUWER, PSSR, Proof Loads, NDTs or any other inspection, test or certificate your business runs.

Built to match how you already inspect, not the other way round

The checklist above is one template out of an unlimited number your team can build. Question wording, answer format, required photo evidence, sign-off rules, all configurable per asset type, per discipline, or per client if you’re a service provider running inspections for others.

CheckedOK is already used by 24,600+ engineers to run more than 38 million inspections across 577,000+ sites, covering LOLER, PUWER and other statutory regimes with checklists built around each customer’s own process.

Want to see your own checklist built out, or the admin side where templates get created?

 

An NFC-compatible tag being scanned using CheckedOK